Providing expeditions
since 2005
27 April 2009, 13:15. Everest, all programs »

It is a rest day at the Base Camp after going to Camp 2 - Advanced Base Camp (ABC).

Our ABC is located right at the foot of Mt. Everest`s Western wall and overlooks other camps at the location. From ABC one looks straight at Western Cwm - a giant amphitheater made up by the Everest, Lhotse and Nuptse wall. From ABC we could also see our future route climbing Lhotse face, crossing the site of Camp 3 (7300m) and continuing across the Yelow band (a distinct layer of light rock crossing the black wall from left to right). The route then crosses Geneva Spur (7600m) and leads onto South Col - a saddle between Everest and Lhotse at roughly 8000m, and the site of our future Camp 4, the summit camp.

It was windy at times during the trip, but overall everybody made it fine through this acclimatization trip and through spending a night at Camp 1 and another at ABC. Our time of crossing Khumbu Ice Fall was significantly better - about half of the time it took us the first time around. Today we learned that high winds raked Western Cwm and some of the tents at ABC got flattened by it, so the camp has to be partially reconstructed in the coming days.

We plan our next climb after several days` rest, probably towards the second half of the week of April 27.

Sent via BlackBerry from T-Mobile

ABC





























Way to ABC